PrepAMT Academy

AMA · AF-09 · FAA-H-8083-31B CH. 9

FAA A&P Airframe: Aircraft Electrical Systems

For the FAA A&P Airframe test, aircraft electrical systems is chapter 9 of FAA-H-8083-31B, Aircraft Electrical System. Its ACS subject area, Aircraft Electrical Systems, is 5 to 10% of the test, or 5 to 10 of its 100 scored questions. Our question bank holds 452 questions on it, and the 10 below were written for this page.

Test shares and most-missed codes read from the FAA on 15 November 2026.

01 WHAT IT COVERSFAA-H-8083-31B · CH. 9

What FAA-H-8083-31B chapter 9 covers

Chapter 9 covers the electrical system as a whole: batteries, lead-acid and nickel-cadmium, and how to service them; DC generators and alternators, voltage regulation and generator control; AC power and inverters; and how power is distributed through buses.

Then the wiring: choosing a wire size for its current and voltage drop, marking, bundling, clamping and routing wire, connectors, bonding and grounding, circuit protection with fuses and circuit breakers, switches and relays, aircraft lighting, and reading wiring diagrams.

It runs from pages 9-1 to 9-103 of the Aviation Maintenance Technician Handbook: Airframe, which the FAA publishes free as a PDF.

02 SHARE OF THE TESTFAA-G-ACS-1 · BLUEPRINT

How much of the FAA A&P Airframe test it is

  • 5 to 10%OF THE TESTACS area AM.II.K
  • 5 to 10QUESTIONSof 100 scored
  • 452IN OUR BANKquestions on this subject

The FAA’s Companion Guide to the ACS gives every subject area a range, not a count. Aircraft Electrical Systems (AM.II.K) is 5 to 10% (5 to 10 questions) on the 100-question Airframe test. The 15 ranges for the Airframe test add up to anywhere from 75% to 160%, so they say how big an area can get, not how many questions you will see from it.

No code in this area is on the FAA’s latest list of most-missed codes (2nd Quarter, CY25), which names a code only when it was missed more than 70% of the time on at least 100 tests.

03 EXAMPLE QUESTIONSWRITTEN FOR THIS PAGE

Aircraft electrical systems questions and answers

10 questions in the test’s own format, each with 3 options and 1 correct answer. Pick yours, then open it to see the answer and the reason. Each one names the page it was written from, so you can check it.

  1. Q.01

    In a normal aircraft charging system, about how long a flight does the generator or alternator need to bring the battery back to full charge?

    FAA-H-8083-31B, ch. 9, p. 9-24

    1. AThe first few minutes after takeoff
    2. BA flight of 1 hour to 90 minutes
    3. C4 hours or more of flying
    SHOW THE ANSWER

    THE ANSWER IS B.

    A flight of 1 hour to 90 minutes

    A battery's state of charge is the running total of its charging and discharging. In a normal electrical charging system, the generator or alternator brings the battery back to full charge during a flight of 1 hour to 90 minutes. A few minutes after takeoff is far too short, and 4 hours is about the length of the slow top-up charge a NiCd gets in the shop, not a recharge in flight.

  2. Q.02

    Space is tight inside a junction box, and someone suggests mounting a new relay on the inside of the box cover. Why does the handbook call that poor practice?

    FAA-H-8083-31B, ch. 9, p. 9-91

    1. AThe box would lose its drain path, so moisture would collect inside
    2. BThe box could no longer be bonded to the aircraft structure
    3. CIts clearance from the parts inside cannot be inspected with the cover closed
    SHOW THE ANSWER

    THE ANSWER IS C.

    Its clearance from the parts inside cannot be inspected with the cover closed

    Equipment is not mounted on the covers or doors of junction boxes, because once the cover or door is shut nobody can inspect how much clearance the equipment has from the wires and terminals inside. A relay on the cover does nothing to the drain holes in the lowest part of the box, and it does not stop the box itself being bonded to structure.

  3. Q.03

    Why should one ground connection not be shared by several circuits or functions, unless it can be shown that doing so creates no hazard?

    FAA-H-8083-31B, ch. 9, p. 9-85

    1. AA single bad connection could then disable several circuits at once
    2. BA shared ground point raises the voltage on every circuit it serves
    3. CA ground stud may carry only one lug, so a second voids its rating
    SHOW THE ANSWER

    THE ANSWER IS A.

    A single bad connection could then disable several circuits at once

    Common ground connections for more than one circuit or function are avoided unless it can be shown that a fault affecting them all would not be hazardous. If that one connection loosens or corrodes, every circuit on it can fail together, and even when that is not dangerous in itself, losing several systems at once can badly distract the crew. The rule is about that shared failure, not about circuit voltage, and a stud may carry more than one lug.

  4. Q.04

    A wire bundle has to come down into the top of a junction box, and there is no room for a drip loop. What should be done?

    FAA-H-8083-31B, ch. 9, p. 9-80

    1. ALeave the entry open, since any fluid on the wires drains off inside
    2. BSeal the wire entrance to the manufacturer's specifications
    3. CWrap the bundle in tape where it enters so fluid runs off
    SHOW THE ANSWER

    THE ANSWER IS B.

    Seal the wire entrance to the manufacturer's specifications

    Fluid and condensation follow a wire down into whatever it enters. A drip loop takes the wires below the entry and back up, so the fluid collects at the bottom of the loop and drips off. Where wires must run downward into a box and a drip loop will not fit, the entrance is sealed to the manufacturer's specifications to keep moisture out. Leaving it open lets the fluid straight in, and a wrap of tape is not the specified seal.

  5. Q.05

    A new wire bundle climbs straight up the face of a bulkhead for several feet. Why should plastic cable ties not be what holds it along that run?

    FAA-H-8083-31B, ch. 9, p. 9-81

    1. APlastic ties are not allowed anywhere inside a pressurized cabin
    2. BA vertical run has to be laced with cord, since clamps cannot be used on it
    3. CSlack can creep down a vertical run and end up causing chafing
    SHOW THE ANSWER

    THE ANSWER IS C.

    Slack can creep down a vertical run and end up causing chafing

    Plastic clamps and cable ties must not be used on vertical runs where slack could migrate without anyone meaning it to. On a run that goes straight up and down, the bundle can slip through the ties a little at a time until the slack gathers low down and rubs. Cushioned clamps are what normally support a bundle along its run, so a vertical run can be clamped, and plastic ties are restricted by where their failure or slack could do harm, not by cabin pressurization.

  6. Q.06

    A new wire run has to pass through a belly area where water and other fluids collect. How should it be routed?

    FAA-H-8083-31B, ch. 9, p. 9-80

    1. AAlong the lowest point, so any leak on it is easy to spot
    2. BAs far from the lowest point as possible, or in a moisture-proof cover
    3. CTight against the skin at the low point, so it cannot move and chafe
    SHOW THE ANSWER

    THE ANSWER IS B.

    As far from the lowest point as possible, or in a moisture-proof cover

    Wires and cables in bilges and other places where fluids collect must be routed as far from the lowest point as possible, or else be given a moisture-proof covering. The low point is where the fluid sits, so it is the worst place for a wire run, however easy it is to inspect there and however firmly the run is clamped.

  7. Q.07

    A power return ground for a new pump has to be made in an area where fuel vapor can collect, and there is no other place to put it. What does the handbook require of that connection?

    FAA-H-8083-31B, ch. 9, p. 9-85

    1. AIt must not arc, spark or overheat under any fault, lightning included
    2. BIt must go straight to magnesium structure, which cannot spark
    3. CNothing special, since a properly torqued lug never sparks
    SHOW THE ANSWER

    THE ANSWER IS A.

    It must not arc, spark or overheat under any fault, lightning included

    Power return and fault current ground connections inside flammable vapor areas are avoided. When one has to be made, it must not arc, spark or overheat under any current flow or mechanical failure, including currents induced by lightning. Magnesium is the wrong choice, since wiring must not be grounded directly to magnesium structure because of the fire risk, and torque alone is no promise against a spark when fault current flows.

  8. Q.08

    An airplane has 2 AC generators, one on each side. The right generator is supplying backup power to equipment in the left equipment rack. How should that backup AC ground return be labeled?

    FAA-H-8083-31B, ch. 9, p. 9-85

    1. AAC Left, since the equipment sits in the left rack
    2. BDC Backup, since it is not the normal power source
    3. CAC Right, after the generator that is supplying it
    SHOW THE ANSWER

    THE ANSWER IS C.

    AC Right, after the generator that is supplying it

    Return currents from different sources are kept on their own identified ground points, so that noise from one source is not coupled into another. When the right AC generator backs up equipment on the left side, that backup ground return is labeled AC Right, and the left generator's own returns go to a point labeled AC Left. Calling it DC is wrong because the current it carries is AC.

  9. Q.09

    A wire bundle has to make a turn tighter than its minimum bend radius, because there is no room for a wider one. What does the handbook call for at that bend?

    FAA-H-8083-31B, ch. 9, p. 9-79

    1. AEnclose the bend in insulating tubing
    2. BCut the bundle and splice every wire at the bend
    3. CLeave it bare, but add a clamp on each side of the bend
    SHOW THE ANSWER

    THE ANSWER IS A.

    Enclose the bend in insulating tubing

    Wire bundles are normally bent no tighter than 10 times the outside diameter of the largest wire, or 3 times where the wires break out at a supported terminal strip. Where wiring cannot be installed within those radius requirements, the bend is enclosed in insulating tubing. Splicing every wire is not the fix, since splices are kept to a minimum, and clamps alone do nothing to protect the insulation in a tight bend.

  10. Q.10

    A lead-acid battery copes well with a high rate of discharge for a short time. What usually happens if that high rate is kept up for a long period?

    FAA-H-8083-31B, ch. 9, p. 9-24

    1. AThe plates harden, so the battery holds more charge afterward
    2. BEach cell's voltage climbs above its nominal 2 volts
    3. CThe cell plates warp, which can short out the battery
    SHOW THE ANSWER

    THE ANSWER IS C.

    The cell plates warp, which can short out the battery

    A lead-acid battery can deliver a high rate of discharge and performs well at low temperature, but holding a high discharge rate for a long time usually warps the cell plates, and warped plates can short the battery out. Discharge lowers cell voltage rather than raising it above the nominal 2 volts, and a long heavy discharge does nothing to add to what the battery can hold.

We wrote these questions for this page from the FAA handbooks. They are not FAA test questions, and none of them comes from our question bank. Each one names the handbook page it was written from, so you can check it.

04 AND THEN THE ORAL§ 65.79

How a missed code comes back at the oral

Your test report does not show the questions you missed. It prints the ACS code for what each one tested, and a question missed in this subject prints a code that starts AM.II.K. The examiner reads those codes before your oral and practical.

The Airframe oral runs from 4 questions if your written was clean up to 34, because every code you missed adds 1 more. Airframe also carries 11 practical projects, each with 2 questions attached.

Knowledge elements are tested on the written test and the oral; Risk Management elements are tested on the oral and the practical; Skill elements are tested on the practical only. The whole process is on the oral and practical page, and there are cards to practice the spoken half with on FAA A&P oral test practice questions.

05 COMMON QUESTIONSFAQ

Questions people ask about aircraft electrical systems

Q.01

How is the size of aircraft wire chosen?

By the current it has to carry and the voltage drop allowed over its length, read from the wire charts. Wires bundled into a harness carry less current than the same wire on its own, so the chart’s figure is derated for a bundle.

Q.02

What colors are aircraft position lights?

Green at the tip of the right wing, red in the same place on the left wing, and white at the tail, usually on the vertical stabilizer, where it can be seen from behind. Position lights are also called navigation lights.

Q.03

What does a circuit breaker protect?

The circuit, from faults such as a short circuit, by opening it when too much current flows. Aircraft breakers are trip-free, so they cannot be held closed against a fault, and when one trips the circuit is checked and the fault found before it is reset.

Q.04

Why is bonding needed on an aircraft?

Bonding is the electrical connecting of conducting parts that are not otherwise well connected. Poor bonding or grounding can cause unreliable systems, radio interference, static damage to sensitive electronics, shock hazards and damage from a lightning strike.

Q.05

How many aircraft electrical systems questions are on the FAA A&P Airframe test?

The FAA does not publish a fixed number. Its Companion Guide to the ACS gives the Aircraft Electrical Systems subject area 5 to 10% of the Airframe test, which is 5 to 10 of the 100 scored questions. That is a range, not a quota, so your own test can land anywhere inside it.

Q.06

Which FAA handbook chapter covers aircraft electrical systems?

Chapter 9 of FAA-H-8083-31B, the Aviation Maintenance Technician Handbook: Airframe, titled "Aircraft Electrical System". It runs from pages 9-1 to 9-103, and the FAA publishes the whole handbook free as a PDF.

FREE PLAN · NO CARD · 25 QUESTIONS TO START

The bank holds 452 aircraft electrical systems questions.

Start with one free set: 25 questions and 25 fill-in-the-gaps from any of our 44 subjects, which cover every ACS subject area. Each question has 3 answer choices, like the FAA A&P tests, with a written explanation behind every answer and, for every answer written from the FAA handbooks, the chapter it came from. It needs no card. Pro opens the rest of the bank, the full study guides and the timed mock papers.

Start free

Or answer a few first. The free FAA A&P practice test runs on the page, with no account.